Customers
Real parts, real results.
Case studies from engineering teams shipping with Vixiv — what they needed, what the model generated, and the numbers that came back.
Case study · ManufacturingRead the case study
77% Lighter, 200 lbs of Performance, All in 99 Seconds.
How Vixiv optimized an HP MJF bracket in PA12 to support 200 lbs of force in 99 seconds, guaranteed for their customer.
77%Mass Reduction
99 SecondsTime to optimize with Vixiv
250% IncreaseOver Load Requirement

Case Study · ManufacturingRead More Here
87% Savings per Mold, Designed and Delivered in Less than a Week.
How Vixiv accelerated blow mold prototyping while saving thousands in cost.
+80%Cost Savings Per Mold
1.5 MinTo Optimize with Vixiv
78% Mass Reduction

Case study · AutomotiveRead more here
Race-Ready in 34 Seconds.
How Bearcat Motorsports cut 42% of weight out of a critical front wing element, and finished the race because of it.
−42%mass reduction
65 hoursdesign, manufacturing, and assembly time saved
1black flag (disqualification) prevented
